VoltMap

Industries

Logistics parks: stop the chargers and the conveyors peaking together.

When the afternoon wave starts, conveyors, dock doors and vehicle chargers all pull at once. VoltMap spaces them out so the work gets done and the peak doesn't.

Level 0–3Advice and approved changes today. Automated load shifting and demand response open at Levels 2 and 3.
  • Distribution centers
  • Fulfillment hubs
  • Fleets with EV charging

Example case

Modeled example

A distribution park spending $900,000 a year. Electric yard trucks plug in at shift change, exactly when the outbound conveyors ramp up, and the two together set the monthly peak.

Annual electricity cost
$900,000
Locations
1
Demand charges, share of bill
40%
Service level
Level 0–3
Pricing model
Savings share: 25% of direct utility savings, nothing upfront
Annual Gross Value Delivered$135,63015.1% of annual electricity cost
Annual Net Value to Client$104,130after the platform fee, year one
Year one
Direct utility savings$126,000Operational and AP value$9,630Annual Gross Value Delivered$135,630Less: platform fee−$31,500Annual Net Value to Client$104,130
Year one, from gross value to what you keep
Annual Gross Value Delivered$135,630
Direct utility savings$126,000
Operational and AP value$9,630
Less: platform fee, 25% of direct utility savings$0 upfront. Operational and AP value is included free.−$31,500
Annual Net Value to Client$104,130
Year oneEach following year
Annual Gross Value Delivered$135,630$117,630
Less: platform fee−$31,500−$27,000
Annual Net Value to Client$104,130$90,630

The audit refund is counted once, in year one. The other items continue for as long as the service runs.

Where the value comes from
Rate and tariff optimization$72,000Historical bill audit refund, one-time$18,000Peak and load optimization$36,000AP labor hours saved$630Late fees and usage spikes avoided$9,000
  • Direct utility savings: counted in the savings share
  • Operational and AP value: included free

Assumptions: Rate and tariff optimization: 8% of annual electricity cost; Historical bill audit refund, one-time: 2% of annual electricity cost, year one only; Peak and load optimization: 10% of demand charges; AP labor hours saved: 1.5 hours per location per month at $35 an hour; Late fees and usage spikes avoided: 1% of annual electricity cost

This is a modeled example, not a customer result. It uses the conservative default rates explained on the Annual savings page. Actual figures are confirmed on your own utility bills. How annual savings are calculated

What VoltMap does here

  • Delays and paces vehicle charging so it fills the valleys instead of stacking on the peak.
  • Sequences conveyor and sorter start-up across the shift change.
  • Warns the day before when weather and volume point to a costly peak.

How it is put in place

  1. Day 1

    Connect

    Authorize access to your utility accounts or upload 12 to 24 months of bills. Nothing is installed on site.

  2. Week 1

    Baseline

    VoltMap audits the bill history, builds a weather-adjusted baseline, and sends a savings opportunity report for your review.

  3. Weeks 2 to 4

    First actions

    Charging windows move away from shift change and conveyor start-up is sequenced. Operations sign off on the schedule before it applies.

  4. From day 30

    Watch

    Every new bill is collected and checked. Peak alerts arrive a day ahead, and equipment health alerts begin once 30 days of history are in place.

  5. Every month

    Verify and settle

    A statement compares each bill with the baseline. The platform fee is billed only on savings that have been verified.

How results are measured

A baseline first
Twelve to 24 months of your own history, adjusted for weather and operating hours, sets what the bill would have been.
Verified on real bills
Savings are confirmed on the utility bill itself: the rate applied, peak kW and kWh, line by line.
Only bill savings are shared
The platform fee applies to verified reductions and refunds on the utility bill. Hours saved and late fees avoided are reported but never billed.
Reported every month
One statement shows gross value, the fee and your net value. Enterprise customers can add an annual third-party audit.

Tracked for this sector: peak kW by hour, charger and conveyor overlap in minutes, demand charge per month and cost per pallet moved.

See the numbers for your own sites.

Send three months of bills from up to three locations. We'll show what was overpaid and why, using your own figures.

Request a demo